The essentials of Canon v1.1: the definition, the five terms, the Ten Laws, the formula and the bands. The full canon, with ownership tests, counterweights, review cadence, instruments, validation protocol and a worked example, is in the PDF.
Part I
Definition
Maintenance Gravity is the accumulating upkeep burden a system places on the people accountable for it, expressed through the change capacity consumed by preserving existing capability and the necessary upkeep left outstanding. It rises when capability is added faster than coherence is preserved, and is shaped by complexity, dependency, opacity, rate of change and the clarity of ownership.
Part II
The five terms
Each term is scored 1 to 5 from evidence, never from opinion. Scores 2 and 4 sit between the anchors below.
| Term | What it measures | 1 | 3 | 5 |
|---|---|---|---|---|
| C, Complexity | How many moving parts the system has and how entangled they are | Few parts; a change stays where it is made | A moderate number of parts; some changes ripple to neighbours | Many parts; most changes ripple unpredictably; no one holds a full map |
| D, Dependency | How much the system relies on what its accountable people do not control: vendors, APIs, models, packages, single individuals | Few dependencies, all pinned, each with a tested fallback | Several dependencies, mostly pinned; fallbacks only for critical ones | Many dependencies, unpinned or on "latest", no fallbacks, or one person holds critical knowledge |
| O, Opacity | How difficult it is to see what the system is doing and when it is failing | Failures alert a named person; behaviour can be traced; operating notes are verified | Major failures alert; minor ones are found by users; some notes contradict behaviour | Failures surface through customers or by chance; no traces; notes absent or contradicted |
| R, Rate of change | New or materially changed capability per 90 days, relative to inventory (Part IV) | Under 2.5% of inventory | 5–10% | Over 20% |
| OC, Ownership Clarity | How clearly named and able the people who answer for each part are (Part VII) | Critical components have no named owner, or owners who fail the Part VII tests | Most components have named owners; the tests are not demonstrated for some | Every critical component has an owner who passes all four tests |
Part III
The Ten Laws
The Ten Laws carry over from v1.0, reworded for precision. In v1.1 each law names the term it acts through, so a law can be checked against a score rather than only quoted.
| # | Law | Statement | Acts through |
|---|---|---|---|
| I | Every capability creates maintenance | Every tool, automation, integration or agent adds future upkeep from the day it is added | C, R |
| II | Invisible systems decay faster | What no one can see, no one maintains | O |
| III | Capability without ownership is deferred incident | Every capability needs a named owner and a plan for when it fails | OC |
| IV | AI multiplies output before governance catches up | Output scales on adoption; the discipline to maintain it scales only by design | R, O |
| V | Dashboards can hide reality | A dashboard is control only when its source, owner and use are explicit | O |
| VI | Human memory is not infrastructure | Knowledge held by a single person is a single point of failure | D, O |
| VII | Integration multiplies blast radius | Every connection spreads failure as well as capability | C, D |
| VIII | Gravity compounds quietly | It accumulates unseen until a trigger exposes it | Upkeep outstanding |
| IX | Speed without escalation conceals failure | Problems need a defined path to an accountable human | OC, O |
| X | Survivability outranks elegance | Durable systems keep operating and remain intelligible under pressure | All terms |
Part V
The formula
The score multiplies the four burden terms, divides by ownership squared, and maps the result onto 0 to 100. Squaring ownership is a declared prior: it encodes the doctrine's claim that ownership is the master counterweight. The claim is tested in the pilot, not assumed to be true (V.6).
V.1 Raw value.
Raw runs from 0.04 (all burden terms 1, OC 5) to 625 (all burden terms 5, OC 1).
V.2 Score.
Part VI
Bands
Bands classify the burden of keeping a system. They do not predict the probability of an outage, a financial loss or a failure. Like every threshold in v1.1, they are provisional.
| Band | Score | What it describes |
|---|---|---|
| Light | 0–20 | Upkeep barely registers against new work |
| Manageable Drag | 20–40 | Upkeep is noticeable; building continues at pace |
| Operational Weight | 40–60 | Upkeep competes with building for the same people |
| Fragility Zone | 60–80 | Preserving outweighs building; small changes risk breakage elsewhere |
| Collapse Risk | 80–100 | Change capacity is collapsing: the accountable people can no longer keep up with what exists |
Downloads
The canon, in full.
- Download PDF
Canon v1.0, Public Edition
July 2026. Superseded by v1.1.
- Download PDF
Canon v1.1, Public Edition
14 November 2026. Current version.
Licensed under CC BY-ND 4.0. Cite as: Maghazi, E. (2026). Maintenance Gravity Canon — Public Edition v1.1. Cognitive Empire Systems Ltd.
